SDG&E Line 1600: Install approximately 73,920 feet (14 miles) of 16-inch steel transmission pipeline.
SCG Primex Farms: Install 48,000 feet (9 miles) of 10-inch high pressure gas line.
SCG Line 42-46: Installed approximately 12,000 (2 miles) feet of 16-inch steel transmission line.
SCG El Segundo Loop: Installed approximately 16,000 feet (3 miles) of 20-inch gas transmission lines
SCG Line 1252 and MSA Installation Station: Installed approximately 15,000 feet (2.84 miles) of 12-inch steel gas line and a 8- high pressure Meter Set Assembly.
Airport Projects
Los Angeles International Airport: Install Jet Fuel Hydrant System Tom Bradley International. Installed 16” jet fuel main line, 14 hydrant pits, 3 IVP’s and 1 main vault. Install 1000ft of 20-inch, 1200ft of 12-inch, 1000 ft. of 6-inch of Jet fuel line. Installed 10 LPD’s & 8 HPV’s.
SeaTac International Airport: Worked on various jobs installing aircraft fuel pipe and hydrant pits. Also installed fuel system control valve vaults, HPV’s LPD, and inspection pits. Involved in extensive modifications to fuel farms including, but not limited to, tank modifications, new pumps and filter skids, suction and supply lines.
John Wayne Airport: Installed 1775 ft. of 14-inch containment with 10-inch carrier pipe, installed 250 ft. of 10-inch containment with 6” carrier pipe, installed 10 hydrant valve pits and 2 IVP’s.
San Francisco International Airport: Installed Jet Fuel Main Line, IVP, hydrant pits and associated laterals at international terminal.